Design engineering and construction for strengthening and widening of NH - 4 from Belgaum to Maharashtra border (chainage 515 km to 592 km) from existing two lanes to four/six lanes, including 5 km bypass and
142 km of service road, widening of structures to four/six lanes construction of seven grade separator and vehicular underpass and cross drainage structures
Punj Lloyd Ltd
Plate No. 2, Second Floor, Tower No. 2, NBCC Plaza, Sector V, Pushp Vihar, Saket, New Delhi-110017